Installing the grain intake hopper, The parts of the dryer wet bin – Grain Systems PNEG-1891 User Manual
Page 39

Chapter 6: Installing the Wet Bin
Figure 6-8 Latches for the belt guard cover
Installing the Grain Intake Hopper
To ensure that the dryer receives the incoming wet grain, you must connect the grain intake hopper
between the dryer wet bin and the equipment that supplies the wet grain.
1. Locate the hopper assembly (D01–0193) over the grain intake opening at the top rear of the dryer.
2. Connect the hopper assembly to the dryer wet grain bin by using six 1/4 in. x 3/4 in. self-drilling
screws (S-6497), six 5/16 in. x 3/4 in. flange bolts (S-6606), and six 5/16 in. flange nuts (S-3611).
Figure 6-9 Hopper assembly and hopper installation location
A
Hopper assembly (D01–0193)
B
Hopper installation location on load auger
assembly
The Parts of the Dryer Wet Bin
Shows the dryer wet bin parts for easy identification of parts.
Pneg-1891 Portable Dryers
39
- PNEG-1890 (16 pages)
- PNEG-595 (26 pages)
- PNEG-1472 (30 pages)
- PNEG-897 (58 pages)
- PNEG-838 (4 pages)
- PNEG-1755 (36 pages)
- PNEG-524 (24 pages)
- PNEG-1080 (2 pages)
- PNEG-728 (47 pages)
- PNEG-673 (57 pages)
- PNEG-1717 (88 pages)
- PNEG-823 (42 pages)
- PNEG-630-6S (23 pages)
- PNEG-1876 (80 pages)
- PNEG-102 (2 pages)
- PNEG-366 (51 pages)
- PNEG-1626 (1 page)
- PNEG-1874 (78 pages)
- PNEG-1798 (34 pages)
- PNEG-1927 (4 pages)
- PNEG-924 (2 pages)
- PNEG-582 (26 pages)
- PNEG-012 (46 pages)
- PNEG-1797 (86 pages)
- PNEG-546 (26 pages)
- PNEG-951 (102 pages)
- PNEG-1650 (92 pages)
- PNEG-1649 (50 pages)
- PNEG-1376 (88 pages)
- PNEG-361 (46 pages)
- PNEG-338 (32 pages)
- PNEG-1276 (78 pages)
- PNEG-1283 (22 pages)
- PNEG-1089 (14 pages)
- QSG-001 (2 pages)
- PNEG-950 (96 pages)
- PNEG-1590 (3 pages)
- PNEG-501 (33 pages)
- PNEG-1447 (68 pages)
- PNEG-707GSI (446 pages)
- PNEG-349 (32 pages)
- PNEG-236 (22 pages)
- PNEG-743 (16 pages)
- PNEG-900 (54 pages)
- PNEG-1935 (92 pages)