Chapter 7: Roof Assembly

Table 7-1 A-frame installation sequence and temperature cable locations for 60 ft diameter bin (cont'd.)

A-frame number

Rafter Number

Temp Cable Number

Radius Location

A3

R6

R7

T5

20 ft

A4

R16

R17

T10

20 ft

A5

R1

T2

20 ft

R20

A6

R10

R11

T7

20 ft

A7

R4

R5

T4

20 ft

A8

R14

R15

T9

20 ft

A9

R18

R19

T11

20 ft

A10

R8

R9

T6

20 ft

NA

Attach to center collar

T1

3 ft

NOTE: A-frames labeled “A1” through “A4” have X-bracing and are installed first. A-frames labeled “A5”

through “A10” are standard A-frames. The empty spaces that are not labeled must have purlins
installed between the rafters after all the A-frames are secured. The numbers reflect the recom-
mended installation sequence of the A-frame assemblies.

Table 7-2 Starting lengths for temperature cables for 60 ft diameter bins

Length from the center collar

179.80 in. (434.06 cm)

Length from 20 ft diameter location

58.1 in. (147.57 cm)

The temperature cable lengths in the chart above are the distances from where the temperature cable
attaches to the rafter or the center collar to the top ring. To calculate the correct temperature cable length,
add 32 inches for each bin ring to the starting length. Temperature cables must terminate above any
unload equipment and be secured in place with twine. DO NOT allow cables to become tangled in unload
equipment.