Grain Systems Tanks PNEG-4060 User Manual
Page 104
Guidelines for Assembling and Lifting the A-Frame Rafter Sections
The roof is assembled in sections and referred to as A-frame rafter sections. Each A-frame rafter section is
assembled on the ground and lifted into place.
IMPORTANT: Do not drill additional holes in purlins. Install the flange bolts and nuts as dictated by the
number of holes in the purlin.
NOTE: Use purlin clips as lifting points, as shown.
Figure 7-22 Recommended lifting points for A-frame sections
A
Purlin clip
The A-frame rafter section has two configurations: with X-bracing and without. The number of A-frame
rafter sections with X-bracing depends on which size bin is being constructed.
DANGER
All lifting should be performed by a certified crane operator with prior bin
construction experience. Never lift during windy conditions.
General Guidelines:
• Construct the A-frame sections on flat ground or blocking.
• Install the temperature cable brackets at the same time you assemble the A-frame sections.
• Always be aware of the orientation of each part prior to assembling.
• Use the correct hardware for the part being assembled. Never substitute hardware.
• Always ensure hardware is tightened prior to lifting.
104
Pneg-4060 60 Ft Diameter 40-Series Bin