beautypg.com

Chapter 7: roof assembly – Grain Systems Tanks PNEG-4060 User Manual

Page 81

background image

Chapter 7: Roof Assembly

Figure 7-5 Details of 2–Post eave angle

A

Top sidewall sheet

G

Eave angle end hole alignment on the sidewall
sheet

B

Roof rafter

H

Top of the top sidewall sheet

C

Inside stiffener

I

Bottom of the top sidewall sheet

D

Eave angle

J

Sidewall hole (alignment of either the middle
hole or the end hole of the eave angle)

E

Eave angle middle hole (13th hole) align-
ment on the sidewall sheet

K

Sidewall hole (alignment of either the middle
hole or the end hole of the eave angle)

F

Eave angle end hole alignment on the side-
wall sheet

NOTE: Top sidewall sheet must use the correct orientation to align with the eave angle as shown.

Align the middle hole (13th hole) of the eave angle at the inside stiffener locations on the top
sidewall sheet as shown.

After You Finish
Continue this procedure for the remaining eave angles.

Pneg-4060 60 Ft Diameter 40-Series Bin

81