Attaching the cable wrap to the arm, Attaching the display, Installing cable management – Atdec Spacedec SD-AT-DW Installation manual User Manual
Page 2
attaching the Cable Wrap to the arm
e
e.1. Position the display at its highest possible position to ensure that there is sufficient cabling at the end of the
arm so the cables are not stretched or pulled out when the display is moved.
BeFORe pROCeeDING TO THe NeXT STep pLeaSe NOTe:
Wall Articulated Arm will only work when a display is properly installed.
DO NOT adjust tension screws or gas strut until your display has been attached.
Direct Wall Mount Continued.
B
Tighten
using the
Top
Cap Tool
Insert
Threaded
rod and
Top Cap
Direct Wall
Mount
Bracket
Plastic
Bottom
Cap
Arm with
inner tube
B.3.1.
attaching the Display
C
75mm x 75mm (3” x 3”) mounting hole pattern
Display
4x10mm
Screws
75mm
(3”)
75mm (3”)
100mm x 100mm (4” x 4”) mounting hole pattern
NOTe:
ensure that the
flat side of each
extension Clip sits
against the back
of the display
Extension Clip
4x12mm or
4x16mm Screws
100mm
(4”)
100mm (4”)
Display
Installing Cable Management
D
D.1. Push the four supplied Cable Clips into the holes on the underside of the Wall Articulated Arm as shown.
D.2. Feed the cables into the Cable Wrap Applicator.
D.3. Insert the Cable Wrap Applicator into the Cable Wrap as shown.
D.4. Squeeze the nose of the Applicator and place inside the Cable Wrap ensuring that the opening edges of
the Cable Wrap face towards the nose of the applicator as shown in diagram.
D.1.
Push in
Clips
Nose
D.2.
D.3.
D.4.
B.3. Attach the Spacedec
Arm to the Direct Wall Mount
Bracket. (see diagram B.3.1)
Tighten the Top Cap with the
supplied Top Cap Tool. (see
diagram B.3.2.)
1
3
2
4
B.3.2.
Cable Clips (x3)
Display at
highest point
e.1.
Tighten