Split phase operation, Split phase operation –17, Figure 2-9 – Xantrex Technology XDI2048 User Manual

Page 37: Split-phase operation –17, Figure 2-9 split-phase operation

background image

Connection Schemes

TM-DIOP-01XN-01

2-17

Split Phase Operation

Use this scheme to extend the output voltage. No more than two units
should be connected in series though more can be added in parallel with
either series unit.

To connect two units for split voltage, proceed as follows:

First ensure power to the rack has been disconnected. make
connections to the CAN/SYNC connector using its screw-type wire
clamps. It may be necessary to remove the mating connector to
facilitate connections to the terminal

Start with the phase synchronizing lines on the CAN/SYNC
connector. Wire the “SYNC_OUT 0” and “RETURN” of the first unit
in the top phase to those of the first unit in the bottom phase.

To add units in parallel on either top or bottom phase, see “Parallel
Operation” on page 2–15 for wiring
details.

To create the Split-voltage between the top phase and bottom phase,
connect the L2 terminals of the first group to L1 terminals of the
second group. This node must also be connected to safety ground.

This leaves L1 of top phase and L2 of bottom phase as the output
terminals. These should be connected to the load or distribution bus
using a suitably rated circuit breaker.

Load Terminal Voltage

Output Voltage

120 V model

230 V model

Terminal - Terminal (L1-L2)

240

460

Terminal - Chassis (L1-GND or L2-GND)

120

230

Figure 2-9 Split-Phase Operation

L1
L2

UNIT 2

UNIT 1

2

6

3 5 7

4

1

4

7

5

3

6

2

1

L2

L1

L1

L2

TO TOP PARALLEL UNITS

TO BOTTOM PARALLEL UNITS

2-POLE BREAKER