beautypg.com

Wayne-Dalton 8800 User Manual

Page 17

background image

17

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the

Find a Dealer section online at www.wayne-dalton.com

Tools Needed:

Tools Needed:

iNST

alla

Tio

N

16

17

Torsion end bearing brackets

imPoRTaNT: RIGhT AND LEFT hAND

IS ALWAYS DETERMINED FROM INSIDE

ThE GARAGE LOOKING OUT.

End bearing brackets are right and left.

Using the upper slots in the end bearing

bracket, position above the flagangle and

secure the end bearing bracket to the

horizontal angle using

(2) 3/8”- 16 x 3/4” hex head bolts and (2)

3/8”- 16 hex nuts.

Once the bracket is secured to the horizontal

angle, secure the top of the end bearing

bracket to the jamb using (2) 5/16” x 2” lag

screws. Repeat for other side.

Power Drill

7/16” Socket

Driver

9/16” Socket

Ratchet Wrench

9/16” Wrench

Step Ladder

LEFT END BEARING

BRACKET

hORIzONTAL ANGLE

(2) 5/16” x 2”

LAG SCREWS

(2) 3/8”- 16 x 3/4”

hEx hEAD BOLTS

(2) 3/8”- 16

hEx NUTS

center bearing bracket

Power Drill

7/16” Socket

Driver

Level

Tape Measure

Pencil

1/4” Torx Bit

Step Ladder

Measure to locate the center of the door and

mark a vertical pencil line on the mounting

surface above the door, to indicate the center

line of the door. Then, measure from the center

of the bearing, in one of the end bearing

brackets, DOWN to the top of the door. Using

that dimension, measure UP from the top of

the door and mark a horizontal pencil line on

the mounting surface, intersecting the vertical

pencil line. Now align the edge of the center

bearing bracket along the vertical pencil line

on the mounting surface. Center the bearing

bracket on the horizontal line. This will ensure

the torsion tube is level between the center

and end bearing brackets. Attach the center

bearing bracket, in this location, to the mounting

surface, using (2) 5/16” x 2” lag screws and

(1) 5/16” x 2” tamper-resistant lag screw.

imPoRTaNT: USE ThE 5/16” x 2” TAMPER-

RESISTANT LAG SCREW ONLY IF MOUNTING

SURFACE MOUNTED OVER MASONRY.

TAMPER-RESISTANT LAG SCREW MUST BE

ATTAChED ThROUGh ThE BOTTOM hOLE

OF ThE CENTER BEARING BRACKET.

VERTICAL LINE

MOUNTING SURFACE

EqUAL DISTANCE

CENTER OF END

BEARING BRACKET

hORIzONTAL

LINE

CENTER BEARING

BRACKET

CENTER

BEARING

BRACKET

(2) 5/16” x 2”

LAG SCREWS

MOUNTING

SURFACE

hORIzONTAL LINE

VERTICAL

LINE

(1) 5/16” x 2”

TAMPER-RESISTANT LAG SCREW

OR (1) 5/16” x 2” LAG SCREW