Procedure and result of equipment selection
1. Procedure of equipment selection
a. Calculate cooling for every room.
b. Select an indoor unit to match the cooling load for every room from the table on page 10.
c. Select the outdoor module to match the indoor units selected in point b. Select the outdoor modules
based on the critical factors and the combination rule. Choose a tentative outdoor module that will match
the indoor units, and check whether the selection agrees with the combination rule. Perform the capacity
correction based on the pipe length, system lift, indoor set temperature, outdoor temperature.
Then, make sure the corrected system cooling capacity satisfies the cooling load.
2. Equipment selection and capacity check
Air conditioning load
Equipment selection
Floor
Room No.
Indoor air conditioning load (kW)
Indoor unit
Outdoor unit
Model
Capacity (kW)
Model
Capacity (kW)
Cooling
Heating
MMU-
Cooling
Heating
MMY
Cooling
Heating
4F
4-1
6.0 (16 o’clock)
5.4
AP0241H
7.1
8.0
AP2801HT8
78.5
88.0
4-2
5.2 (14 o’clock)
4.2
AP0181H
5.6
6.3
4-3
5.0 (14 o’clock)
4.2
AP0181H
5.6
6.3
4-4
3.2 (12 o’clock)
2.7
AP0121H
3.6
4.0
4-5
6.4 (10 o’clock)
5.4
AP0241H
7.1
8.0
3F
3-1
12.7
12.0
AP0481H
14.0
16.0
2F
2-1
4.8
4.5
AP0181H
5.6
6.3
2-2
4.6
4.8
AP0181H
5.6
6.3
2-3
—
—
—
—
—
1F
1-1
6.5
6.0
AP0241H
7.1
8.0
1-2
6.5
6.3
AP0241H
7.1
8.0
1-3
7.2
7.0
AP0301H
9.0
10.0
1-4
5.1
4.5
AP0181H
5.6
6.3
Note: ( ): Peak occurrence time
Piping distance
Capacity correction
Capacity check after correction
Floor
Room No.
Equivalent
Height
Pipe correction x
Capacity (kW)
Result
length (m)
difference (m)
temp. correction
Cooling
Heating
Cooling
Heating
4F
4-1
43
12
0.920
0.957
6.5
6.9
Good
4-2
x
x
5.2
5.4
4-3
1.0
1.0
5.2
5.4
4-4
x
x
3.3
3.5
4-5
1.0
0.95
6.5
6.9
3F
3-1
=
x
12.9
13.8
2F
2-1
0.920
0.95
5.2
5.4
2-2
=
5.2
5.4
2-3
0.864
—
—
1F
1-1
6.5
6.9
1-2
6.5
6.9
1-3
8.3
8.6
1-4
5.2
5.4