beautypg.com

Teledyne 4220 User Manual

Page 60

background image

4220 Flow Meter
Section 2 Programming

2-32

If you select ROUND PIPE for the Manning flow conversion, the
following displays will appear:

Slope is entered as a dimensionless quantity, delta Y/ delta X, not
as percent slope. Or, as otherwise expressed:

Roughness coefficients are published in the Isco Open Channel
Flow Measurement Handbook
. You must know the material the
pipe is made of. The roughness coefficients are published for all
common materials in three grades: minimum, normal and
maximum. Then:

If you select U-CHANNEL for the Manning flow conversion, the
following displays will appear:

(

Slope and roughness are entered as for ROUND PIPE previ-
ously.) Then:

If you select RECTANGULAR for the Manning flow conversion,
the following displays will appear:

(Slope and roughness are entered the same as for ROUND PIPE
previously.) Then:

MANNING ROUND PIPE
SLOPE = X.XXXXX ROUGH = X.XXXX

MANNING ROUND PIPE
DIAMETER = X.XXX FEET (or meters)

MANNING U-CHANNEL
SLOPE = X.XXXXX ROUGH = X.XXX

MANNING U-CHANNEL
WIDTH = X.XXX FEET (or meters)

MANNING RECTANGULAR
SLOPE=X.XXXXX ROUGH=X.XXX

MANNING RECTANGULAR
WIDTH=X.XXX FEET (or meters)

Δ

X

ΔY

1

100

Rise

Run

= .01

=

For
example: