beautypg.com

Raypak XPAK 85 User Manual

Page 58

background image

58

IMPORTANT
A GAS TIGHTNESS CHECK MUST BE CARRIED OUT IF ANY
GAS CARRYING COMPONENTS HAVE BEEN REMOVED,
REPLACED, OR DISTURBED.

XPAK LPG LABEL
1. Fill in the enclosed LPG label with all the information required

and affix the label as close as possible to existing rating plate

2. Affix the enclosed RED color label over the existing YELLOW

color label under the boiler near to the boiler gas connection.

SEQUENCE OF THE IGNITION SYSTEM
Switch on the boiler as follows:
- Open the gas tap under the boiler by turning it

counterclockwise

- Turn on the general switch of the system and then, after lowering

the flap, turn the function selector to summer

, winter

or

winter tank temperature

F

depending on the chosen operating

mode.

The boiler start to run according the automatic sequence: heat
request, fan start-up, tachometer check, ignition trials, gas
opening and ignition start-up.

Fig. 4

Maximum screw

Minimum screw

Compensation

pipe connection