beautypg.com

Dimensions and connections (fig. 4) – Raypak XPAK 85 User Manual

Page 14

background image

14

Minimum Clearances to Combustibles

Top=0
Front =0 AL, CL
Rear=0
Left=0
Right=0

AL = Alcove
CL = Closet

Note:
The XPak boiler has passed the zero inches vent clearance to combustibles testing requirements provided by the boiler Harmonized
Standard ANSI Z21.13b 2007 – CSA 4.9b 2007 and therefore is listed for zero clearance to combustibles when vented with a single
wall special venting system (AL29-4C material) or UL/ULC-listed gas vent material. The zero inches vent clearance to combustibles
for the XPak boiler supercedes the clearance to combustibles listing that appears on the special venting system label.

DIMENSIONS AND CONNECTIONS (Fig. 4)

Recommended minimum service clearances

1” (25 mm)

1” (25 mm)

XPak 85= 3-15/16“ (97 mm)
XPak 120= 4-1/2“ (114 mm)

=

=

30-3/4” (781 mm)

XPak 85 = 15-3/4” (400 mm)

XPak 120 = 17-3/4” (451 mm)

Fig. 4

50 mm

50 mm

150 mm

from cas

ing or

25 mm abo

ve

flu

e elbow

(whiche

ve

r i

s ap

plicable)

150 mm

1” (25 mm)

6” (150 mm)

12” (300mm)

1” (25 mm)

30-3/4” (781 mm)

14-1/8” (359 mm)

water 4-7/8” (124 mm)

5-1/2”

(140 mm)

8-5/8”

(219 mm)

gas 6-13/16” (173 mm)