Installation, Framing & finishing, Inst alla tion – Regency Liberty L676 User Manual

Page 11

background image

Regency

®

L676 Direct Vent Gas Fireplace

11

INST

ALLA

TION

INSTALLATION

Diagram 1

1) Frame in the enclosure for the unit with framing material. The framed

opening for the assembled kit is 45-7/8" high x 43" wide x 24-1/4"
deep (1143mm x H 1092mm W x 616mm D). See Diagram 1. Also
see Diagram 2 for corner installations.

IMPORTANT: Header must be metal stud.

Note: When constructing the framed opening, please ensure

there is access to install the gas lines when the unit is installed.
See diagram 3 for details.

2) For exterior walls, insulate the enclosure to the same degree as the rest

of the house, apply vapour barrier and drywall, as per local installation
codes. (Do not insulate the fi replace itself.)

3) The unit does not have to be completely enclosed in a chase. You

must maintain clearances from the vent to combustible materials: See
"Clearances" section. Combustible materials can be laid against the
side and back standoffs and the stove base.

FRAMING & FINISHING

Diagram 2

Diagram 3

Non-Combustible Requirements

IMPORTANT

If converting this unit to LP, it is highly recommened
the conversion be done BEFORE the unit is slid into

position for ease of conversion. See "Conversion

from NG to LP" section for instructions.