Important, 2004 roberts-gordon – Roberts Gorden Vantage TF-Series User Manual
Page 33
ROBERTS GOR DON
®
T F-S
E RIE S
S
UB MI TT AL
S
HEE T
© 2004 Roberts-Gordon
APPL ICATION S, ENGI NEE RING AND DET AI LE D GUID ANCE ON SYST EMS DE SIGN, INSTAL LATI ON AND PRODUCT PE RFORMANCE IS AVAI LABLE UPON RE QUEST. ROBERT S GORDON
®
PRODUCT S ARE T O BE
INSTAL LE D ONL Y IN ACCORDANCE WI TH L OCAL L AWS, CODES AND REGUL AT IONS, AND ONLY BY A CONT RACT OR QUALI FIE D I N THE I NST ALL AT ION AND SE RVICE OF GAS-FIRE D HE AT ING EQUI PME NT.
CFlexible Boot Installation (Single Vent)
Common Sidewall Venting
Tube
Vent
Boot Clamp
Flexible Boot
Vent Sleeve
Bead
3"
(8 cm)
3"
(8 cm)
2"
(5 cm)
Expansion
Gap
Flexible Boot Installation
for Single Vent
Boot Clamp
Single Wall
Vent Pipe
Flexible
Boot
Tube
Bead
2 min.
(5 cm)
Description
Part Num ber
Rolled Sleeve
09080000
Flexible Boot 4" (10 cm)
91412800
Boot Clamp 4" (10 cm)
91901300
Burner
Tube
Vent Terminal
Combustible or
Non-Combustible
Wall
6" (15 cm) Single Wall Pipe
Flexible
Boot
*
6" (15 cm)
Vent Pipe
Vent Tee
Boot
Clamp
*
IMPORTANT
Compress boot on installation
to allow at least 2" (5 cm) of
movement on each side for
thermal expansion of tube
away from the tee.
Plan View
Description
Part Number
Vent Tee
91916100
Vent Terminal 6" (15 cm)
90502101