beautypg.com

Multi-tier installation – Raritan Computer Paragon P2-UMT1664M User Manual

Page 92

background image

82

P

ARAGON

II U

SER

M

ANUAL

Multi-Tier Installation

In a multi-tier configuration, the order of powering ON is critical to proper function.

Last tier switches must be powered ON before the intermediate level of tier

Intermediate tier switches must be powered ON before the base Paragon II unit can be powered ON.

User Stations (UST1s) can be powered ON and OFF at any time as needed.

There is a five-second ON/OFF down time in the UST1 or Paragon II power cycle.





This manual is related to the following products: