CHAPTER 3
ND-45492 (E)
Page 36
Revision 2.0
(b) Secure the AC CORD-B cables to the FG, NEUTRAL and LINE terminals as shown in
. The 3P AC Power Cable and the FG Cable are pre-installed with the BASE.
Figure 003-12 Screwing the AC CORD-B to the Terminals
NAP 200-003
Sheet 14/37
Installation of Main Equipment
FG
NEUTRAL
LINE
BASE
3P AC POWER CABLE
TO 120/240 V AC
SOURCE POWER
AC POWER
KNOCK OUT HOLE
(PROVIDED WITH BASE)
FG CABLE
(PROVIDED WITH BASE)
PIM
AC CORD-B
TO PZ-PW86 IN PIM
(PROVIDED WITH PIM)
PUSH
PULL
: INSERT THE AC CORD
: FIXED THE AC CORD
CORD BUSH
(PROVIDED WITH BASE)
SUPPLEMENTARY GROUND
(TO COLD WATER PIPE, ETC.)