3. HOW TO FOLLOW THIS MANUAL
The Installation Procedure is shown by means of flowcharts with NEC Action Procedure (NAP) numbers. The
details of each step are described in the NAPs.
3.1 SCOPE OF INSTALLATION PROCEDURES
This manual covers the installation shown in
Figure 1-2 Scope of Installation Works
INSTALLATION OF MAIN EQUIPMENT
MOUNTING OF CIRCUIT CARDS
INSTALLATION OF
PERIPHERAL EQUIPMENT