beautypg.com

In stal la tion 1, Re ceiving & un packing equip ment 1, Pre-installation check point 1 – Nortec 132-3091 User Manual

Page 4: Ba sic hu mid ifier con fig u ra tion 1, Installation, Receiving & unpacking equipment, Pre-installation checkpoint, Basic humidifier configuration

background image

INSTALLATION

RECEIVING & UNPACKING EQUIPMENT

1.

Check packing slip to ensure ALL material has

been delivered.

2.

All material shortages are to be reported to

NORTEC within 48 hours from receipt of goods.

NORTEC assumes no responsibility for any

material shortages beyond this period.

3.

Inspect shipping boxes for damage and note on

shipping waybill accordingly.

4.

After unpacking, inspect equipment for damage

and if damage is found, notify the shipper

promptly.

5.

All NORTEC products are shipped on an F.O.B.

factory basis. Any and all damage, breakage or

loss claims are to be made directly to the shipping

company.

PRE-INSTALLATION CHECKPOINT

1.

Ensure that available voltage and phase

corresponds with humidifier voltage and phase as

indicated on humidifier’s nameplate label (see

Figure #1).

2.

Ensure that the dedicated external disconnect is of

sufficient size to handle the rated amps as

indicated on the nameplate label. Refer to local

codes.

3.

Report any discrepancy immediately.

BASIC HUMIDIFIER CONFIGURATION

NORTEC humidifier models NHMC, NHP and

NHB share a modular sheet metal cabinet. Each unit

has a right side electrical compartment. Each

electrical compartment has a hinge-down front door

which is removable from any partially or fully opened

position. Each electrical compartment has a

screw-mounted right side cover which can also be

removed for ease of electrical connection. For safety,

the door when closed keeps the side cover from being

removed.

Single units have a plumbing compartment

attached to the left side of the electrical. Double units

have a second plumbing compartment. Each

plumbing compartment has a hinge-down front door

which is not intended to be removed. For safety, the

door must be closed in order to engage the shared

lock. To avoid any danger, never operate the

humidifier with a door off. For safety, each door when

closed engages its own safety interlock switch. All

switches must be engaged before the unit will operate.

To open the doors, unlock key, lift door up slightly

and pull top of door forward. Door will hinge 180

degrees and hang straight down. To remove door,

swing door parallel to floor. Then lift up slightly and

out. To reinstall door, hold parallel to floor and insert

hinge pins at bottom.

- 1 -

Power And

Control

Wiring

Condensate

Return

Steam

Outlet

Drain

Water

Supply

Nameplate

Label

Figure #1

NH Series Humidifier

TOP VIEW

WALL

WITHOUT BLOWER PACK

MIN. 36" SIDE

CLEARANCE

RECOMMENDED.

SEE NOTE.

NOTE: LOCAL AND NATIONAL

CODES MAY DEVIATE. PLEASE

CONSULT APPLICABLE CODES

FOR CLEARANCE REQUIREMENTS

IN ALL CASES.

MIN. 36"

FRONTAL

CLEARANCE.

Figure #2

Clearance Requirements