Evacuation (installation) – Panasonic CS-A9CKPG User Manual
Page 60

(No refrigerant in the refrigeration cycle)
1. Connect the vacuum pump to the charge set’s centre
hose.
2. Evacuation for approximately one hour.
•
Confirm that the gauge needle has moved toward -0.1
MPa (-76 cmHg) [vacuum of 4 mmHg or less.]
3. Close the valve (Low side) on the charge set, turn off
the vacuum pump, and confirm that the gauge needle
does not move (approximately 5 minutes after turning
off the vacuum pump).
4. Disconnect the charge hose from the vacuum pump.
•
Vacuum pump oil
If the vacuum pump oil becomes dirty or depleted,
replenish as needed.
12.1.5. Evacuation (Installation)
Procedure:
60
CS-A9CKPG CU-A9CKP6G / CS-A12CKPG CU-A12CKP6G
See also other documents in the category Panasonic Conditioners:
- SD43C90JAU6 (2 pages)
- CU-E9GFE-2 (42 pages)
- CU-C9CKP5 (6 pages)
- CU-E12GKR (8 pages)
- CW-A90VR (2 pages)
- CU-E18JKK (10 pages)
- CU-A24CTP5 (4 pages)
- CS-E24EKRS (12 pages)
- CU-E18CKE (100 pages)
- CS-TE9DKE (80 pages)
- CU-E18HKR (8 pages)
- CU-E18GKR (8 pages)
- CW-C101MU (24 pages)
- CU-E21FKR (12 pages)
- CU-C12CKP6G (24 pages)
- SD39C77JAU6 (2 pages)
- 2008 (28 pages)
- CS-E18JKK-1 (12 pages)
- DD51C78GBU6 (2 pages)
- CW-C83GU (56 pages)
- CS-S12JKUW (20 pages)
- CS-C28CKU (10 pages)
- CW-XC185HU (36 pages)
- CU-C9BKP6 (24 pages)
- CS-XC241KP (48 pages)
- Matsushita SD51C94JBU6 (2 pages)
- CW-C202KR (8 pages)
- CU-E15DKR (6 pages)
- CU-XE12EKE (20 pages)
- DC57C84RCU6 (2 pages)
- QA125K29CAU6 (2 pages)
- CW-1703SR (14 pages)
- CS-E28JKR (8 pages)
- CW-XC105HU (36 pages)
- CS-E12CKP (95 pages)
- CU-E21DKR (12 pages)
- SD48C10JAU6 (2 pages)
- CW-A240SR (14 pages)
- DA86C15RCU6 (2 pages)
- CW-XC118HU (36 pages)
- CU-W12DKR (6 pages)
- CW-XC184HU (37 pages)
- SD51C10JAU6 (2 pages)
- DA66C10RCU6 (2 pages)
- CW-C120AU (24 pages)