beautypg.com

Install spectralink 6000 system, Survey site – Polycom SpectraLink 6100 MCU User Manual

Page 28

background image

5

Install SpectraLink 6000 System

Survey Site

Check the site to be sure pre-installation work has been completed
correctly. This includes:

†

Location chosen for the MCU is adequate, and power is available.

†

Wiring to Base Station locations has been pulled and correctly
terminated.

†

Phone lines for the SpectraLink 6000 Wireless Telephones are
installed and properly terminated.

†

Dedicated line is available for remote access to diagnostic modem.

†

Telephone system administrator is on-site to program the existing
telephone system.

If the work has not been completed, the Polycom field service
engineer can leave the site and reschedule the installation when the
items have been completed or corrected, or assist in preparing the
site.

PN: 1725-36097-001_G.doc

28