Site preparation, Required materials provided by customer – Polycom SpectraLink 6100 MCU User Manual
Page 15
3
Site Preparation
Required Materials Provided by Customer
The following equipment must be provided by the customer:
Outlet Strip
Recommended for installations with more than one
MCU. This will allow the MCUs to be turned on and off together.
Cross-Connect Block
Required to connect the telephone switch
ports and the Base Stations to the MCU.
25 Pair Cables
RJ-21 male at MCU end, required to connect the
MCU to the cross-connect blocks.
Backboard Space
The MCU is designed to be wall mounted to
3/4” plywood securely screwed to the wall.
Quick Clip Fuse
Required with an RCO410 Outdoor Base Station
or when a Base Station is located in a separate building from the
SpectraLink 6100 MCU. Recommended Quick Clip Fuse is
available from Illinois Tool Works, Linx Division, Model # SCP-
2X2.
Base Station Mounting Hardware
If the Base Stations will be
mounted on finished walls or ceilings, a 4 to 5” long 1/4” bolt,
nuts, and washers will be required for each Base Station mounted.
PN: 1725-36097-001_G.doc
15