Quick start procedure, Network cabling examples, Power – Paradyne 3162 User Manual
Page 4

2
Quick Start Procedure
The following procedure is for experienced DSU/CSU users who are familiar with the
3162 DSU/CSU installation process and have no special requirements for their
application. See the
ACCULINK 3162 Data Service Unit/Channel Service Unit User’s
Guide for more information.
1. Attach the power cord to the rear of the DSU/CSU and the other end to a grounded
115 Vac power outlet.
2. Attach the 3162 DSU/CSU network connection to the T1 network using the
appropriate cable. Attach the 3162 DSU/CSU to the customer premises equipment
via the DTE (DSX-1) and/or port connectors.
3. Power on the DSU/CSU to perform the power-up self-test.
97-15575
Power
Power
3162
DSU/CSU
3162
DSU/CSU
Terminal
COM
Port
Network
Port
COM
Port
Network
Port
SNMP
Manager
or
Terminal
or
PORT 1
AUX
POWER
NETWORK
CAUTION:
AUX PORT OR COM PORT MUST NOT BE CONNECTED TO PSTN OR T1 NETWORK
NEC
CLASS 2
INPUT
COM
PORT 2
DSX-1
EXT. CLOCK
PORT 1
AUX
POWER
NETWORK
CAUTION:
AUX PORT OR COM PORT MUST NOT BE CONNECTED TO PSTN OR T1 NETWORK
NEC
CLASS 2
INPUT
COM
PORT 2
DSX-1
EXT. CLOCK
NETWORK
Cabling Examples