beautypg.com

Operation – Lincoln Electric POWER WAVE 11124 User Manual

Page 44

background image

B-6

OPERATION

B-6

9. AC Switch Assembly W/Impeller Fan

10. Optional CE Filter Assembly (not shown): CE

compliance filter connects in series with input con-
nection. Available for K2344-2 only.

POWER-UP SEQUENCE

When power is applied to the Power Wave AC/DC
1000, the status lights will flash green, for up to 15
seconds. This is normal and indicates Power Wave
AC/DC 1000 is performing a self test, and mapping
(identifying) each component in the local ArcLink sys-
tem. The status lights will also flash green as a result
of a system reset or configuration change during oper-
ation. When the status lights become steady green
the system is ready for normal operation.

If the status lights do not become steady green con-
sult the troubleshooting section of this manual for fur-
ther instruction.

POWER WAVE® AC/DC 1000

1

2

9

8

3

4

5

7

6

FIGURE B.6

CASE REAR COMPONENTS
DESCRIPTION (See Figure B.6)

1. Input Contactor: Connection point for incoming 3

Phase power (see "Recommended Input Wire and
Fuse Size" chart in this document).

2. Case Ground: The frame of the welder must be

grounded to earth at this terminal. See your local
and national electrical codes for proper grounding
methods.

3. Auxiliary Reconnect: Select proper tap based on

input voltage.

4. CB3: Primary side protection for auxiliary trans-

former (T2).

5. CB4: Primary side protection for auxiliary trans-

former (T1).

6. Impeller Fan Technology

TM

provides superior

cooling.

7. Master/Slave Input (S12): Input connection for

paralleling machines, or multi-arc synchronization.

8. Master/Slave Output (S13): Output connection for

paralleling machines.

This manual is related to the following products: