beautypg.com

Installation, Connection diagram - parallel machines, Front view of machines rear view of machines – Lincoln Electric POWER WAVE 11124 User Manual

Page 23: A-13

background image

A-13

INSTALLATION

POWER WAVE® AC/DC 1000

A-13

M

MA

AS

ST

TE

ER

R

S

SL

LA

AV

VE

E

K1795-XX Cables

Connection Diagram - Parallel Machines

(Example depicts a single arc grouping, and may be repeated for each arc in the system)

Connect additional

SLAVE

machines as required to reach
desired capacity.

Note: Each arc is limited to 5
SLAVE machines per MASTER
(6 machines total)

S12 (Input)

S13 (Output)

Connect to optional
K2282-1 System Interface
for Synchronized
Multiple Arc Applications

Ethernet

Note:
Ethernet connectivity allows machines to share critical
parameter information. Proper configuration requires the use of
the

Weld Manager and SubarcCellConfig software utilities.

Common bus connections
recommended for
excessive cable length
applications. (Locate
close to power sources.)

* Electrode
Cables

* Work Cables

Work

Electrode

Front view of machines

Rear view of machines

* Refer to "Output Cable Guidelines" for recommended cable size.

Ethernet Switch

This manual is related to the following products: