0 locating the sts2/pdu, 1 anchoring the unit to the floor, Ocating – Liebert STS2 User Manual
Page 15: Sts2/pdu, Anchoring the unit to the floor

Locating The STS2/PDU
7
3.0
L
OCATING
T
HE
STS2/PDU
This section provides instructions for leveling the STS2/PDU and anchoring the unit to the floor,
should that be required.
3.1
Anchoring the Unit to the Floor
The STS2/PDU can be anchored to the concrete floor to ensure stability for the unit in the event of
seismic activity.
3.2
Leveling of the 250A Only STS2/PDU Without Anchoring
The 250A Static Transfer Switch 2 Power Distribution Unit is furnished with casters and leveling
feet. After final positioning of the unit, adjust the leveling feet located in each corner of the frame base
to level and stabilize the unit.
For leveling feet details, see Figures 7 through 11.
This manual is related to the following products: