8 2nd transfer roller cleaning operation timing, 2nd transfer roller cleaning operation timing -54 – Konica Minolta 5430 DL 5440 DL 5450 User Manual
Page 91
2nd Transfer Section
Main Unit Theory of Operation
2-54
II Comp
osition
/O
p
eration
9.2.8
2nd Transfer Roller cleaning operation timing
• The 2nd Transfer Roller cleaning sequence is carried out after the Intermediate Transfer
Belt has been cleaned during recovery from a media misfeed or malfunction.
• The cleaning sequence is carried out if 100 printed pages are produced after the last
cleaning sequence.
• The cleaning sequence is carried out when a media size error occurs.
1.
The 2nd Transfer Roller is pressed.
2.
The 2nd transfer bias voltage of reverse polarity is applied for the period of time corre-
sponding to one revolution of the 2nd Transfer Roller.
3.
The 2nd transfer bias voltage of forward polarity is applied for the period of time corre-
sponding to one revolution of the 2nd Transfer Roller.
4.
Steps 2 and 3 are repeated five times.
5.
The 2nd Transfer Roller is retracted.
2nd Transfer Roller
2nd transfer bias (reverse polarity)
2nd transfer bias (forward polarity)
Pressed
Retracted
4138to2148e0
5430DL_5440DL_5450_TO_PDF.book 54 ページ 2005年4月12日 火曜日 午後4時49分