beautypg.com

Connecting the base, Putting the telephone into operation – Siemens 4110 User Manual

Page 14

background image

13

Putting the telephone into operation

Gigaset 4110isdn, GBR, A31008-G4110-B102-2-7619

Inbetriebnahme.fm

4.9.02

Step

by

step

Connecting the base

Only use the plug-in power supply unit provided (as identified on the
underside of the base).

Plug-in power sup-
ply unit
(220/230 V with
mains cable)

Plug the small
mains cable
connector
into
the socket,

Place the cable
in the cable
channel,

Connect the
plug-in power
supply unit to
the socket.

Plug the phone cable’s connector
into the socket (latches into position),

Place the cable in the cable channel,

Plug the phone connector into the
phone socket/NTBA.

Phone connector with phone cable

Key for
registering other
handsets
(see page 18)

1

2

Info

Only use the cable provided.

!