background image

83

4. Apply heat to copper tubing first and move flame

toward valve socket.
A. Heat copper tubing for approximately 10 to 15

seconds then direct the heat to the solenoid
socket

B. Heat the solenoid socket for 2 to 5 seconds

and apply silver solder to joint.

C. Do not attempt to fill solenoid flange with

solder. Solder will draw into socket.

5. Install new liquid line drier.

6. Leak check joints by pressurizing system with 150-

psig nitrogen.

7. Evacuate and re-charge system to nameplate

charge.

8. Reinstall coil (using a twisting motion) and attach

wiring.

MAX. 1300

°F

(700

°C)

SV3071

SV3073