Putting line hold sheet 3 / line hold cushion – Matsushita CF-Y5LWVYZ 1 2 User Manual
Page 69
69
9.3.6.4. Putting Line Hold Sheet 3 / Line Hold Cushion
< part A details >
< part B details >
< part C details >
< part D details >
< part E details >
0.5 or more
Put on the rib side
while pulling the
tape
Secure the space with
bossing the outer rib
Put on the rib side with
there not loosening
Push the tape and push the Cable by
processing as shown in the figure below
HDD protection slot
Make the rib
under slipped
Put on the rib side by pushing
so that running aground is not
on the boss heaven side
Put on the rib side by processing the
tape to lower more than the boss
heaven side while pushing
Put on the rib side
with there not
loosening
Be careful not to run aground on the boss
heaven side about wire rod fixation tape 3
A
B
C
0-2
2-5
MODEM Cable
LAN Cable
Prevent the cable from
running aground on the
boss heaven side
Prevent the cable from running
aground in boss heaven
side/bossing the outer rib.
Insert the MODEM
cable in the slit
0-1
0-1
Cushion for lead fixation
Pull out a MODEM cable just
beside in an HDD protection slot,
along the HDD protection slot, and
process the MODEM cable forward
D
E
Prevent the cable from
running aground on the
rib heaven side
Pass the under of the cushion
for the lead fixation through
LAN cable
Process the cable in the order
of A-E after positioning the
tube of LAN cable
Prevent the cable from
running aground on the
boss heaven side
LAN Cable (upper)
LAN Cable (upper)
MODEM Cable (lower)
MODEM Cable (lower)
Put wire rod fixation tape 3
wire rod fixation
tape 3
A
B
C
D
E
Put the cushion for the lead fixation
Directionality having
The back
Side without tape
Set the MODEM/LAN
holder in a lower cabinet
Safety work
(Content of this page)