Assembly of the disk cover lock / sw pcb, Assembly of the disk cover click – Matsushita CF-Y5LWVYZ 1 2 User Manual
Page 56
56
9.3.4.10. Assembly of the Disk Cover Lock / SW PCB
< Preparation for Disk Cover Lock >
There is directionality.
R shape is matched.
The insertion
order : 2
The fingernail
is multiplied.
The insertion order : 1
Inserts in R shape part
and the slide in
the right side.
Disk Lock Bush installation
Safety work
The engagement fingernail is
the confirmation two places as
for there is not collapsing.
Hanging fee of fingernail = (0.2)
Hole externals of
Disc Cover Lock
Disc Cover Lock
Convex is on both sides.
Do not crush convex
of this when detaching.
< preparation for solenoid with lead >
Flaking off
paper
Solenoid Fix Tape (FAN/SP)
The same to width
of tape standard
Flaking off paper
leaving side
This side of
red lead
Affixes Solen Fix Tape (FAN/SP)
The half of the
flaking off paper
is put on the
peel cable.
Conclusion of
Screw(DXQT2+F2FNL)
Installation
Solenoid Angle
Solenoid with lead
9.3.4.9. Assembly of the Disk Cover Click
Conclusion Screw(DXHM0057ZA)
Affixes Water Cap Tape
Affixes Insulation Sheet
Water Cap installation
Disk Cover Click
installation
Do not hang the roller end face
in this part on the top case side.