Assembly of the wireless lan module / modem – Matsushita CF-Y5LWVYZ 1 2 User Manual
Page 45

45
9.3.3.6. Assembly of the Wireless LAN Module / MODEM
Board externals
MDC EMI
Sheet
Antenna Board (MAIN)
Connection
Cable is processed
to the board side
PET Tape
(19mmx25mm)
0-2
1-2
Connection
MODEM
The film is
wrapped
The PET Tape (19mmx25mm)
is wrapped
From the tube edge
2-5mm
MODEM Cable
34-36
2.0
2.0
2.0
2.0
Safety work
Safety work
Safety work
Safety work
Safety work
The remainder is affixed
on an opposite side
Fit Board’s hole to
Conductive Cloth’s hole.
EMI Sheet’s for MDC
tape externals
The position is decided with a
treatment device.
Antenna Board (SUB)
Processes to board’s just beside.
W-LAN Module
Connection
-Work in midair prohibition when module is connected with antenna board.
-Connects applying the board to the receiving stand.
(For the distortion prevention of the board)
Put out the position with the tube
drawn to the Jack side