INSTALLATION INSTRUCTIONS
SITE REQUIREMENTS
2.5 Ensure that no naked flame or incandescent part of the fire
bed projects beyond the vertical plane of the fireplace
opening.
2.6 The fire must not be installed in any room that
contains a bath or shower.
2.7 Ensure clearances to combustible materials - see diagram 3.
3
Dimensions given
are to the frame
of the fire.
AR0707
2.8 The maximum depth of combustible shelf is 150mm at a
minimum height of 150mm above the frame.
Refer to the appropriate Frame Instructions regarding
additional wall strengthening for the frame.
3. GAS SUPPLy
3.1 Before installation, ensure that the local distribution
conditions (identification of gas and pressure) and the
adjustment of the fire are compatible.
3.2 Ensure that the gas supply is capable of delivering the
required amount of gas, and is in accordance with the rules
in force.
3.3 This fire is supplied complete with a factory fitted isolation
device incorporated into the inlet connection, no further
isolation device is therefore required.
4. vENTILATION
It is important to ensure that any national ventilation
requirements are taken into account during the installation of
this fire.
4.1 This fire has a nominal input not exceeding 7.0kw
and therefore does not normally require any additional
permanent ventilation.
If, however, spillage is detected when commissioning the fire,
there may be insufficient natural ventilation and additional
ventilation may be required.
For ventilation requirements in the Republic of Ireland, it will be
necessary to refer to the relevant rules in force.