GE SG SERIES 20 User Manual
Page 74
g
GE
OPM_SGS_USM_10K_40K_0US_V010.doc
74/88 Operating
Manual
SG Series 10, 20, 30 & 40 kVA
3. Disconnect the Battery from all Units.
•
Wait 5 minutes for DC-Link Capacitors discharge
.
First operated unit
All other units of the system
4. Disconnect the Utility supply from all Units.
•
All LED’s are OFF.
First operated unit
All other units of the system
End of procedure
This manual is related to the following products: