GE SG SERIES 20 User Manual
Page 51
g
GE
OPM_SGS_USM_10K_40K_0US_V010.doc
51/88 Operating
Manual
SG Series 10, 20, 30 & 40 kVA
7.2.3 Restore to normal operation after “total off”
View of the panel after pressing the
button “total off”.
•
All Contacts are open;
•
Rectifier, Inverter and Static-Switch
shutdown.
1. Reset “total off” by pressing and
holding the “total off” button and the
“inverter on” ( I ) key simultaneously
until the Rectifier starts.
2. Connect the Battery to the UPS by closing the Battery Switch or Fuses, in case
of External Battery.
3. Press “inverter on” ( I ) key.
•
Soft-start of Inverter indicated with
blinking LED.
•
At the end of Soft-start the LED
remains lit.
•
UPS output LED indicates Load on
Inverter.
The LCD must display on the main screen the status “LOAD ON INVERTER”.
End of procedure