beautypg.com

GE SG SERIES 20 User Manual

Page 59

background image

g

GE

OPM_SGS_USM_10K_40K_0US_V010.doc

59/88 Operating

Manual

SG Series 10, 20, 30 & 40 kVA

7.3.5 Reconnect a Unit to a parallel system

1. Connect the Utility supply on the separated Unit.

Press mute, to reset alarm and buzzer.

First operated unit

All other units of the system

2. Close Q1 (Pos. I) on the separated Unit.

Rectifier starts automatically.

First operated unit

All other units of the system

3. Connect the Battery, in case of External Battery, to the UPS on the separated

Unit by closing the external Battery Switch or Fuses.

4. Press inverter on ( I ) key on the separated Unit.

After Soft-start of the Inverter, the Inverter connects automatically to the other Units
of the parallel system.

The LCD must display on the main screen the status LOAD ON INVERTER.

First operated unit

All other units of the system

End of procedure

This manual is related to the following products: