LG 27 Inch Electric Smart Dryer Owners Guide User Manual

Page 24

background image

24

INSTALLATION

3

Install UL-listed strain relief into the power

cord through-hole.

4

Thread the 4-wire #10 AWG minimum copper

power cable prepared in step 1 through the

strain relief.

a

Terminal Block

b

UL-Listed Strain Relief

c

UL-Listed 4-Wire Power Cord

5

Transfer the appliance's ground wire from

behind the green ground screw to the center

of the terminal block.

6

Attach the two hot leads (black and red) of the

power cord to the outer terminal block

screws.

7

Attach the neutral (white) wire to the center

screw of the terminal block.

8

Attach the power cord ground wire to the

green ground screw.

9

Tighten all screws securely.

10

Reinstall the terminal block access cover.

a

White Wire moved from Ground Screw

b

Hot Leads of Power Cord (Black and Red)

c

Neutral Wire (White)

d

Power Cord Ground Wire

e

Ground Screw

Three-Wire Power Cord

1

Remove the terminal block access cover on

the upper back of the appliance.

2

Install the UL-listed strain relief into the

power cord through-hole.

3

Thread a 30-amp, 240 volt, 3-wire, UL-listed

power cord with #10 AWG-minimum copper

conductor through the strain relief.

a

Terminal Block

b

UL-Listed Strain Relief

c

UL-Listed 3-Wire Power Cord

4

Attach the two hot leads (black and red) of the

power cord to the outer terminal block

screws.

5

Attach the neutral (white) wire to the center

terminal block screw.

6

Connect the external ground (if required by

local codes) to the green ground screw.

7

Tighten all screws securely.

a

b

c

a

b

b

c

d

e

• A 3-wire connection is NOT

permitted on new construction after

January 1, 1996.

• A UL-listed strain relief is required.

• Use a 30-amp, 240-volt, 3-wire, UL-listed

power cord with #10 AWG-minimum copper

conductor and closed loop or forked terminals

with upturned ends.

en-us_main.book.book Page 24 Wednesday, December 7, 2022 8:18 AM