Stacking the appliance, Bottom venting, Tools required – LG 27 Inch Electric Smart Dryer Owners Guide User Manual

Page 18: Stacking kit installation

background image

18

INSTALLATION

3

Preassemble a 4" (10.2 cm) elbow

e

to the

next 4" (10.2 cm) duct section, and secure all

joints with duct tape. Be sure that the male

end of the elbow faces AWAY from the dryer.

Insert the elbow/duct assembly through the

side opening and press it onto the adapter

duct. Secure it in place with duct tape. Be sure

that the male end of the duct protrudes 1.5"

(3.8 cm) to connect the remaining ductwork.

Attach the cover plate

f

to the back of the

dryer with the included screw.

Bottom Venting

1

Remove the rear exhaust duct retaining screw

a

. Pull out the exhaust duct

b

.

2

Press the adapter duct

c

onto the blower

housing and secure it to the base of the dryer

as shown.

3

Insert the 4" (10.2 cm) elbow

d

through the

rear opening and press it onto the adapter

duct. Be sure that the male end of the elbow

faces down through the hole in the bottom of

the dryer. Secure it in place with duct tape.

Attach the cover plate

e

to the back of the

dryer with the included screw.

Stacking the Appliance

Tools Required

• Phillips screwdriver

Stacking Kit Installation

WARNING

• The weight of the appliance and the height of

installation make this stacking procedure too

risky for one person. Two or more people are

required when installing the stacking kit.

• Place the washer on a solid, stable, level floor

capable of supporting the weight of both

appliances.

• Do not stack the washer on top of the dryer.
• If appliances are already installed, disconnect

them from all power, water and drain

connections.

This stacking kit includes:

• Two (2) side rails
• One (1) front rail
• Four (4) screws
To ensure safe and secure installation, please

observe the following instructions.

c

d

f

e

a

b

c

d

e

en-us_main.book.book Page 18 Wednesday, December 7, 2022 8:18 AM