Appendix d: brightness control scheduling example – American Time PoE User Manual
Page 34
© American Time
34
PoE Installation Manual
Appendix
Tr
oubleshooting
Configuration
Network Clock
Connect
Installation
Intr
oduction
Specifications
Appendix D: Brightness Control
Scheduling Example
Step 5: Enter the parameters as shown below:
• The Start Date is set to September 12, 2011
• The Start Time is 00:00:00 (Hours dropdown is in military format) which is 12:00 AM
• The Period is set to 1 Day
• The Buzzer/Relay checkbox is not selected
• The Duration is set to 2 seconds (Duration is irrelevant as long as it is not set to ON or OFF for this example)
• Brightness is set to High
• Countdown Duration is set to Off (available only with clocks with countdown functionality)
• No End Date/Time is specified for the recurring event
Step 6: Name the schedule in the Schedule Editor to BrightnessEvent.sch
Step 7: Click Save in the Schedule Editor
Event #0