beautypg.com

Install support system, Connect decorative flue – Broan 63000EX User Manual

Page 7

background image

- 7 -

INSTALL SUPPORT SYSTEM

1. At hood location, install 2 x 4 cross framing

between ceiling joists using dimensions
shown.

2. Finish the ceiling surface. Be sure to mark

the location of the ceiling joists and cross
framing.

3. Position the support frame as shown. The

UP ARROW should point towards the ceiling
after installation.

4. Secure the support frame to joists and cross

framing with four screws provided (6x70mm)
and four washers (D. 6.4mm). Make sure
screws are driven into center of joists and
framing for maximum strength.

5. Adjust the overall height of the support frame.

Loosen and re-tighten the 4 screws in the
height adjustment slots as necessary.
Insert 4 screws (3.9x9.5mm) and 4 washers
(D.4.5mm) located in the Hardware
Package.

Note that the hood height is 10-1/4” and that
the bottom of the hood must be 24” min. and
30” max. above the cooktop.

TOP VIEW OF SUPPORT FRAME

10

7

/

8

” (276mm)

7

13

/

16

(198mm)

CEILING

JOISTS

CROSS FRAMING

FRONT

HEIGHT ADJUSTMENT

SLOTS

SUPPORT

FRAME

9

13

/

16

DRYWALL

MOUNTING

SCREWS

(6x70mm)

WASHERS

(Ø6.4mm)

CONNECT DECORATIVE FLUE

1. Secure the upper flue to the upper support

frame with the mounting screws
(3,9x9,5mm).

2. Insert the lower flue moving it completely

towards the top and fix it temporarily with
retaining screw (3.9x9.5mm).

LOWER

FLUE

UPPER FLUE

MOUNTING SCREWS

(3.9X9.5MM)

INSERT THE LOWER

FLUE

RETAINING SCREW