Chapter 3 maintenance, Introduction, Scheduled maintenance – Integra CROMA24 User Manual
Page 43: Introduction scheduled maintenance, Maintenance
3
MAINTENANCE
43
Maintenance
Introduction
This chapter contains general maintenance and cleaning instruc-
tions for the Croma24 printer.
Scheduled Maintenance
Scheduled maintenance consists of a list of checks that are planned
to be performed on a regular basis or when conditions warrant it.
Scheduled maintenance can be thought of as preventive mainte-
nance since its purpose is to prolong the life of the printer. It is not
intended to repair or isolate an existing problem, though it can
sometimes be helpful in detecting a condition due to a weakened
component that has not yet completely failed.
Below is a list of scheduled maintenance checks and their periodic-
ity.
Clean external areas:
weekly, or
as required
Clean slide shaft:
monthly
Clean service station:
biweekly
Clean encoder strip:
monthly
Clean cartridge dimples:
if prime fails
Clean flex cable contacts:
if prime fails,
or cartridge
is replaced
Clean and inspect motor gears:
annually
Clean and inspect MPCB:
annually
Clean and inspect carrier assembly:
annually
Reseat connectors on MPCB:
annually
Reseat connectors on carrier board:
annually
Replace carrier bushings:
biannually