beautypg.com

Powering up and configuring the server – HP ProLiant DL385 User Manual

Page 55

background image

Server setup

55

IMPORTANT: When using cable management arm components, be
sure to leave enough slack in each of the cables to prevent damage to
the cables when the server is extended from the rack.

7. Connect the power cord to the AC power source.

WARNING: To reduce the risk of electric shock or damage

to the equipment:

Do not disable the power cord grounding plug. The grounding
plug is an important safety feature.

Plug the power cord into a grounded (earthed) electrical outlet
that is easily accessible at all times.

Unplug the power cord from the power supply to disconnect
power to the equipment.

Do not route the power cord where it can be walked on or
pinched by items placed against it. Pay particular attention to
the plug, electrical outlet, and the point where the cord extends
from the server.

Powering up and configuring the server

To power up the server, press the Power On/Standby button.

While the server boots, RBSU and the ORCA utility are automatically
configured to prepare the server for operating system installation.