Chapter 2 installing and starting nas system – PLANET NAS-7450 User Manual
Page 7

7
Chapter 2 Installing and Starting NAS system
This chapter covers the installation procedure of different form factors of NAS
server as well as the NAS-7450 / NAS-7850 Mobile Rack. Instruction on how to
startup the NAS server by setting up the basic configuration through the Admin
Home page or provided software tool – PLANET NAS Finder is also outlined in this
chapter.
2.1 Installing the NAS-7450 / NAS-7850 rack-mount Model
NAS-7450
NAS-7850
Hot swap hard disk tray installation
1. To unlock the hot swap hard disk tray, pull the tab behind the end of the lever
to release the latch and then lift the lever up as far as it can go to disengage
the hard disk tray from the chassis.
Figure 1
2. Pull the hard disk drive tray out.
This manual is related to the following products: