Ab c, Installation and assembly – MCZ Tube 2013 User Manual
Page 19

A
B
C
B
J
17
5-INSTALLATION AND ASSEMBLY
Technical Dept. - All rights reserved - Reproduction is prohibited
PREPARATION AND UNPACKING
The Tube stove is delivered in a single package and the sides and the top are already fitted to the structure.
Open the package, remove the four brackets (B) that block the product to the pallet by removing screws (A) and extracting the bracket (B)
from under the feet "J" of the stove. Set the product in the pre-selected place, making sure this complies with the requirements.
EXAMPLE OF THE STOVE PACKAGING
REMOVING THE PACKAGING
SCREWS
A - SCREW
B - BRACKET
C - PALLET
J - FOOT
This manual is related to the following products: