beautypg.com

Casio FX-9750GII User Manual

Page 408

background image

20051101

8. Press

w.

• This will set up the EA-200 in accordance with the setup data registered in the Econ

Sampling strip. The message “Start sampling?” appears on the screen after EA-200 set
up is complete.

9. Press

w to start sampling.

• The screens that appear while sampling is in progress and after sampling is complete

depend on setup details. For more information, see “Starting a Sampling Operation”
(page 8-1).

• After sampling is complete, the data will be graphed in accordance with the setup

settings.

10.To return to the eActivity workspace screen from the graph screen, press

!a(

'

).

u

u

u

u

u

To graph sampled data from an Econ Graph strip

1. On the eActivity workspace screen, use the

f and c keys to move the highlighting to

the Econ Graph strip.

2. Press

w.

• If this Econ Graph strip already has sampled data registered to it because of a previous

execution, a graph of the existing data will appear on the display. In this case, jump to
step 5 of this procedure.

• If this is the first time you are executing this Econ Graph strip, the Advanced Setup

screen will appear on the display. If this happens, proceed with step 3 of this procedure.

3. Perform steps 4 and 5 under “To configure an EA-200 setup using Advanced Setup (page

3-1) to configure the setup for sampling.

4. Press

1(STRT).

• As instructed by the message that appears on the display, press the

w key to perform

sampling.

• After sampling is complete, the data will be graphed in accordance with the setup

settings.

5. To return to the eActivity workspace screen from the graph screen, press

!a(

'

).

12-6

Calling E-CON2 Functions from an eActivity

This manual is related to the following products: