beautypg.com

Figure b‐3 – Enterasys Networks Enterasys Matrix 9034310-01 User Manual

Page 52

background image

Memory Locations and Replacement Procedures

B-4 Mode Switch Bank Settings and Optional Installations

Figure B-3 NEM Removal and DIMM Connector Location

2.

Refer to 

Figure B‐4

. Push the connector arms away from the DIMM and simultaneously lift the 

DIMM enough to release it from the connector fingers.

Figure B-4 Removing the Existing DIMM

3.

Rotate the DIMM upwards, then remove it from the connector fingers.

1 NEM (optional)

4 Module front panel

2 Main PC board

5 Module connectors on main board

3 Screws (3)

6 DIMM memory module

1 Connector arms

2 DIMM

3 Connector fingers

COM

OFFLINE/ RESET

MGMT

CPU

1

2

GR

OUP

SELECT

1X

11X

13X

12X

14X

23X

24X

G R

O U

P

1

G R

O U

P

2

GR

OUP

1

2

3

4

5

6

7

8

9

10

11

12

2G

40

82

-2

5

Gb ENET

DFE

1

2

3

4

5

6

1

2

3

4

5

6

7G-6MGBIC-A

А

Г

В

Б

В

Д

Е

А

А

Б

В

This manual is related to the following products: