beautypg.com

Chapter 5, Chapter 5: hardware setup, Hardware setup – Lanner LVC-5000(N4) User Manual

Page 24: Preparing the hardware installation

background image

24

Hardware Setup

Chapter 5

Embedded and Industrial Computing

Chapter 5:

Hardware Setup

Preparing the Hardware Installation

To access some components and perform certain service

procedures, you must perform the following procedures

first.

WARNING: To reduce the risk of personal injury,

electric shock, or damage to the equipment,

remove the power cord to remove power from

the server. The power switch button does not

completely shut off system power. Portions of the

power supply and some internal circuitry remain

active until power is removed.

Unpower the LVC-5000 and remove the power cord.

1.

Unscrew the3 threaded screws from the front and rear

2.

panels and two from each sides to take off the bottom

cover.

Open the cover.

3.

Note:

For CF card and SIM card installation, you do

not need to remove the bottom cover. See CF

and SIM card installation for more details.

HDD Installation for model without an

externally removable HDD tray

The system can accommodate one Serial-ATA disk. Follow

these steps to install a hard disk into the system:

Take out the hard disk tray and fix the hard disk on

1.

the tray with 4 mounting screws as illustrated in the

following picture.
Plug the Serial-ATA cable to the hard disk.

2.

Place the hard disk back to the system’s chassis and fix

3.

it with the mounting screws.
Connect the Serial-ATA power and data disk cables to

4.

the Serial-ATA power and disk connectors on the main

board respectively.

1

2

3

4