5 transportation and delivery, 1 delivery, Transportation and delivery – KACO Powador-gridsave User Manual
Page 14: 5transportation and delivery
Transportation and Delivery
Page 14
Operating instructions Powador-gridsave_EN
5
Transportation and Delivery
5.1
Delivery
The battery system leaves KACO new energy in fully functional electrical and mechanical condition.
Special packaging ensures that the units are transported safely. The shipping company is responsible for any trans-
port damage that occurs.
5.1.1
Scope of delivery
Pallet
A
B
Figure
Figure 7: Scope of delivery, pallet A
Figure 8: Scope of delivery, pallet B
Contents
•
Battery system
"Powador-gridsave"
(incl. connection box,
battery management system
(BMS), industrial PC, Plexiglas
cover and accessories)
•
Inverter
•
Battery charging unit/ battery backup converter
(BBC)
•
Battery system plug-in modules 1-5 ST (scope of
delivery can be found on the delivery document)
•
Documentation
Weight (kg)
187
max. 155 / 177 (without / with Euro pool pallet)
H x W x D
[mm]
1780x800x820
1200x1200x800
Packaging
Cardboard box with polystyrene inserts and closures
5.1.2 Check the equipment included
•
Battery system and plug-in modules should be inspected thoroughly for transport damage.
•
Do not install damaged components in the control cabinet.
•
In the event of damage to the battery plug-in modules, contact the KACO new energy Hotline immediately.