beautypg.com

3 connecting the sunny island inverter, 1 connecting the master – SMA Off-Grid Systems User Manual

Page 26

background image

5  Single-Cluster System

SMA Solar Technology AG

26

Off-Grid-IS-en-30

Installation - Quick Reference Guide

5.3 Connecting the Sunny Island inverter

5.3.1 Connecting the Master

Figure 10: Connecting the master in the single-cluster system

Position

Designation

Description/information

A

AC power cable of the

stand-alone grid

Sunny Island: connection to AC1 Loads/SunnyBoys terminals L, N,

and PE
Stand-alone grid: connect master to line conductor L1.
For a single-phase system, the cable length and the conductor

cross-section must be identical on each Sunny Island.
Conductor cross-section: maximum 16 mm²