3 activating and operating the display, Activating and operating the display, Calling up display messages of the start-up phase – SMA SB 3000TL User Manual
Page 44
Position
Symbol
Explanation
Q
-
Diagram with the power curve of the last 16 feed-in hours or
energy yields of the last 16 days
• In order to switch between diagrams, tap once on the
enclosure lid.
R
You can operate the display by tapping on the enclosure lid
(see Section 9.3, page 44).
The displayed error must be rectified on-site by a qualified per-
son (for troubleshooting, see service manual at
lar.com).
The displayed error cannot be rectified on-site.
• Contact Service (see Section 13, page 55).
9.3
Activating and Operating the Display
You can activate and operate the display by tapping on the enclosure lid.
Procedure:
1. Activate the display. Tap on the enclosure lid once.
☑ The backlight is switched on.
2. To move to the next line, tap on the enclosure lid once.
3. In order to switch between the power curve of the last 16 feed-in hours and the energy yields
of the last 16 days in the diagram, tap on the enclosure lid once.
9.4
Calling Up Display Messages of the Start-Up Phase
Various inverter information is displayed during the start-up phase that can be called up whenever
required during operation.
Procedure:
• Tap on the enclosure lid twice.
☑ The display shows all messages of the start-up phase in sequence.
9 Operation
SMA Solar Technology AG
Operating Manual
SB30-50TL-21-BE-en-11