8
Configuration
8.1
Configuration Procedure
Once you have commissioned the inverter, you may have to adjust various settings via the rotary
switches in the inverter or via a communication product. This section describes the procedure for
configuration and gives an overview of the steps you must perform in the prescribed order.
Procedure
See
1.
If the display language is not set correctly, adjust the set-
tings.
2.
In order to use the Webconnect function, integrate the in-
verter into the network.
3.
To manage the PV system data or to set the inverter pa-
rameters, capture the inverter in a communication product.
Manual of the communica-
tion product at
Solar.com
4.
In order to receive control commands of the grid operator
via SMA Speedwire/Webconnect for PV systems in Italy,
set the parameters.
Manual of the Speedwire/
Webconnect interface
5.
Change the system time and system password.
Manual of the communica-
tion product at
Solar.com
6.
If the inverter is installed in an IT network or another grid
configuration where deactivation of the grounding con-
ductor monitoring is required, deactivate the grounding
conductor monitoring.
7.
For partially shaded PV modules and depending on the
given shading situation, you should set the interval at
which the inverter optimizes the MPP of the PV system.
8.2
Changing the Display Language
If the language for the country data set is not the language you want to use, you can change the
display language as follows:
Procedure:
1.
Danger to life due to high voltages
• Disconnect the inverter from all voltage sources and open the enclosure lid (see