Pfr600 series installation information, Installation requirements, Site requirements – Grass Valley PFR600/E User Manual
Page 27: Power, Cooling, Chapter 2, Pfr 600 series installation information, Power cooling, Chapter 2 - pfr600 series installation information, Pfr600 series installation information

20 February 2004
PFR600/E Instruction Manual
27
Chapter
2
PFR600 Series Installation Information
This chapter describes information you’ll need to install the PFR600 Series Fibre
Channel RAID Storage Chassis (PFR600/E). Major topics are:
•
•
Installing a PFR600/E in an equipment rack
•
PFR600/E power-up and initialization
•
Installation requirements
This section describes the following requirements:
•
“Site requirements” on page 27
•
“Chassis address setting requirement” on page 28
•
“Cabling requirements” on page 29
•
“Binding disk modules into groups” on page 30
Site requirements
For proper PFR600/E operation, the installation site must conform to certain
environmental specifications. These are detailed below and in
Specifications and Operating Limits”
Power
“AC power requirements” on page 53
for AC power requirements. The values
indicate either the values for the power cord of a PFR600/E with a single power supply,
or the total values shared by the line cords of two power supplies in the same PFR600/
E, with the division between the power cords and supplies at the current sharing ratio. If
one of the two power supplies fails, the remaining supply and cord must support the full
load. You must use a rack mount cabinet with ac power distribution, and have main
branch ac distribution that can handle these values for the number of PFR600s and
PFR600Es that you will interconnect.
Cooling
Make sure your site has air conditioning of the correct size and placement to maintain
the specified ambient temperature range. The air conditioning must be able to handle the
requirements of the PFR600s and any connected PFR600Es as indicated under